Consultancy Services
Department of Geology
Sl. No | Name of the Staff | Title | Concern | Amount | Date |
1. | A. Antony Ravindran | Groundwater geochemistry in and around zirconium complex, Govt of India | The Project Director, Atomic Energy, Zirconium Complex, Pazhayakayal, Thoothukudi | Rs.20,000 | 01.04.2010 to 06.04.2010 |
2. | A. Antony Ravindran | Sugarcane Agricultural farm groundwater prospecting and Chemicals limited Ambasamudram | The personal manager, Shri Empee Sugar and Chemicals Limited, Alangulam Road, Edaikkal Post, Ambasamudram. | Rs.41,942 | 20.06.2010 to 28.06.2010 |
3. | A. Antony Ravindran | Groundwater Geophysical prospecting in Agricultural farm at Ottapidaram. | Natarajan, 7B, Masilamanipuram, 1st Street, Thoothukudi | Rs.7,000 | 21.06.2010 to 28.06.2010 |
4. | A. Antony Ravindran | Crystalline limestone propecting using geophysical method in Pudhur village, Tirunelveli | Mr.S.T.Alaguvel, Director, Portcity Benefit Fund Ltd, Tuticorin. | Rs.7,000 | 11.07.2010 to 16.07.2010 |
5. | A. Antony Ravindran | Groundwater investigation for RO plant, Puthukottai | Antony raj, Paul sournam Hotel, Thoothukudi | Rs.7,000 | 01.08.2010 to 06.08.2010 |
6. | A. Antony Ravindran | The groundwater geoelectrical exploration survey at Tiruvadanai. | Platinum Textiles Ltd., H.O.117, Thalayuth, Thondi | Rs.7,000 | 10.08.2010 to 21.08.2010 |
7. | A. Antony Ravindran | Groundwater investigation in and around Zirconium Quarters, Thoothukudi | The Director, Zirconium Complex, Govt of India, Pazhayakayal, Thoothukudi | Rs.8,000 | 01.09.2010 to 09.09.2010 |
8. | A. Antony Ravindran | Groundwater investigation using squar array method in Kattalankullam, Thoothukudi | Thomas raja, No.111, South Raja Street, Thoothukudi | Rs.7,000 | 01.09.2010 to 17.09.2010 |
9. | A. Antony Ravindran | Apperent resistivity anisotropy study in rocks using AASR method at Saravanan Patti | Coimbatore sqaravanampatti | Rs.10,000 | 01.01.2016 to 06.01.2011 |
10. | A. Antony Ravindran | Groundwater investigation using square array method in Singikulam | Tirunelveli Singikulam gw survey | Rs.7,000 | 07.01.2011 to 20.01.2011 |
11. | A. Antony Ravindran | Groundwater investigation using square array method in Heavy water Plant, Thoothukudi | Heavy water plant, Govt of India, Thoothukudi | Rs.10,000 | 22.01.2011 to 02.02.2011 |
12. | A. Antony Ravindran | Groundwater exploration study using geoelectrical resistivity at neeravi puthupatti agricultural site, Ettatapuram | Rajamani, VVD main road, Thoothukudi | Rs.8,000 | 03.04.2011 to 11.04.2011 |
13. | A. Antony Ravindran | Groundwater investigation using square array method in Pusuvanthani | Arul Mani, Sterlite staff, 125, Pusuvanthanai main road, Thoothukudi | Rs.2,360 | 11.04.2011 to 21.04.2011 |
14. | A. Antony Ravindran | Crystalline limestone propecting using geophysical method in Pudhur village, Tirunelveli | Murugan Tuticorin | Rs.7,000 | 10.05.2011 to 20.05.2011 |
15. | A. Antony Ravindran | Groundwater investigation in shallow aquifer study using 2D ERI techniques | Dr. Mathan Jeyapaul, Venus home appliance, Thoothukudi | Rs.6,000 | 15.05.2011 to 31.05.2011 |
16. | A. Antony Ravindran | Groundwater investigation using square array method in kattalamkulam farm, Thoothukudi | Pious, Thoothukudi | Rs.7,000 | 15.07.2011 to 28.07.2011 |
17. | A. Antony Ravindran | Sea water ingress and shallow freshwatr study acoastal aquifer and study using azimuthal square electical resistivity method in navaladi garnet mines, Tamilnadu, India. | IOGS pvt ltd, Near 3rd mile, Thoothukudi | Rs.6,000 | 11.12.2011 to 26.12.2011 |
18. | A. Antony Ravindran | Groundwater investigation using square array method in Puthukottai farm, Thoothukudi | Mr. Murugan, 65/6b, Tooveypuram, 4th street, Thoothukudi.3 | Rs.6,000 | 01.01.2012 to 05.01.2012 |
19. | A. Antony Ravindran | Groundwater exploration and electical resistivity distribution study using azimuthal square array method in Puliyangudi, Tamilnadu | Vijaya Raju, Puliyangudi, Tirunelveli | Rs.6,000 | 10.05.2012 to 14.05.2012 |
20 | A. Antony Ravindran | Groundwater investigation using electrical method in avm farm, Tuticorin | AVM exporters, Thoothukudi | Rs.6,000 | 11.06.2012 to 16.06.2012 |
21. | A. Antony Ravindran | Groundwater investigation using electrical method in Thisaiyanvillai | Mr. David Engineer, Tirunelveli | Rs.6,000 | 08.06.2012 |
22. | A. Antony Ravindran | The groundwater geoelectrical exploration survey at Tiruvadanai. | Platinum Textiles Ltd., H.O.117, Thalayuth, Thondi | Rs.10,000 | 11.06.2012 to 21.06.2012 |
23. | A. Antony Ravindran | Groundwater investigation in melamaruthur village,Thoothukudi | Mr. Jeyapaul, Near Michel church, Main Road, Tharuvaikulam | Rs.5,000 | 08.08.2012 to 13.08.2012 |
24. | A. Antony Ravindran | Groundwater investigation in and around the Dindugul region | Jhony Engineer, Tirunelveli | Rs.6,000 | 01.09.2013 to 03.09.2013 |
25. | A. Antony Ravindran | Groundwater exploration study using square array method at madukari, Coimbatore | Sriram properties pvt ltd, Coimbatore | Rs.16,000 | 11.09.2012 to 21.09.2012 |
26. | A. Antony Ravindran | Groundwater exploration study using square array method Kattalamgulam water plant, Thoothukudi | Paul Sornam Water plant, Puthukottai. | Rs.6,000 | 01.10.2012 to 03.10.2012 |
27. | A. Antony Ravindran | Groundwater study in puthukottai water plant | Mr. Chelladurai, Real Estate consultant Thoothukudi | Rs.8,000 | 05.03.2013 to 21.03.2013 |
28. | A. Antony Ravindran | Groundwater investigation in Theivaseyalpuram, Thoothukudi | Rameshkumar Masilamanipuram, 1st Street, Thoothukudi | Rs.6,000 | 01.04.2014 to 11.04.2014 |
29. | A. Antony Ravindran | Groundwater survey using scientific approach in agricultural site near Radhapuram | SAR Enterprises, 1H/2, Madurai By Pass Road, Tuticorin | Rs.6,000 | 04.01.2014 to 21.04.2014 |
30. | A. Antony Ravindran | Groundwater exploration using square array method in great shephered farm Vadakkankulam 2015 | Babin Farm, Vadakkankulam | Rs.6,000 | 09.06.2014 to 13.06.2014 |
31. | A. Antony Ravindran | Gorundwater exploration using electrical methods in Tirunelveli and Thoothukudi | Namachivayan, Civil Engineer, Millerpuram, Thoothukukdi | Rs.5,000 | 25.08.2014 to 02.09.2014 |
32. | A. Antony Ravindran | Groundwater exploration study using electrical resistivity method near Meenachipatti | Malaisoodi cycle mart, Thoothukudi | Rs.6,000 | 01.09.2014 to 09.09.2014 |
33. | A. Antony Ravindran | Limestone investigation using ves and 2d electrical resistivity imaging studies at Tadipatti village | Palavasam, Professor (Rtd) Agricultural farm development, kayathar | Rs.10,000 | 10.01.2014 to 19.01.2015 |
34. | A. Antony Ravindran | Geological and groundwater investigation study in coastal energen pvt ltd power plant, Thoothukudi 2015 | Coastal Energen PVT ltd power plant, Thoothukudi | Rs.6,000 | 15.03.2014 to 20.03.2015 |
35. | A. Antony Ravindran | Groundwater investigation at Tadipatti village | Palavasam, Professor (Rtd) Agricultural farm development, kayathar | Rs.8,000 | 11.05.2015 to 15.05.2015 |
36. | A. Antony Ravindran | Electrical resistivity method and soil test study using electrical resistivity imaging study in Thengapattinam harbour | Sripathy Associates, Erode, Tamilnadu, India | Rs.7,000 | 01.07.2015 to 07.07.2015 |
37. | A. Antony Ravindran | Geotechnical engineering and underground water flow study using electrical resistivity method and hydrochemical investigation in ayyakulam | Dr. David, Engineer Geotechnical consultant Tirunelveli | Rs.7,000 | 01.08.2015 to 10.08.2015 |
38. | A. Antony Ravindran | Groundwater investigation at Vaddakankulam village | Palavasam, Professor (Rtd) Agricultural farm development, kayathar | Rs.6,000 | 01.10.2015 to 06.10.2015 |
39. | P. Sivasubramanian and S. Selvam | Geological and hydro-geological investigation in Tirunelveli Taluk (S.F. No: 106/1A, 106/1B, 106/2, 107/2A, 107/2B and 107/3A) | Thiru.B.Paramasivam Nellaithiruthu, Tirunelveli Taluk Tirunelveli District. | Rs.5,000 | 17.02.2014 to 25.02.2014 |
40. | S. Selvam | Hydro-geophysical investigation in Pavoor Chathiram, Tenkasi Taluk | Thiru.S.M.S.Karthick, Pavoor chathiram, Tenkasi Taluk, Tirunelveli District | Rs.5,000 | 17.03.2014 to 21.03.2014 |
41. | S. Selvam | Soil Investigation about construction of building for Matha Cashew Processing, Nadu Sekkarakudi, Thoothukudi | Shri.Saji St. Jeorge, Matha Cashew Processing, 491/1B Nadu Sekkarakudi, Thoothukudi | Rs.3,000 | 15.08.2015 to 25.08.2015 |
42. | S. Selvam | Soil Investigation about construction of building for M/S Srira Chemical pvt Ltd, No.388/4 Samy Natham, Ottapidaram Taluk, Thoothukudi -Report | M/S Srira Chemical pvt Ltd., No.388/4 Samy Natham, Ottapidaram Taluk, Thoothukudi | Rs.3,000 | 10.12.2015 to 12.12.2015 |
43. | S. Selvam | Soil Investigation about construction of building for Mr.M. Rajagopal Survey No: 527/1A, Srivai-Vagaikulam Main Road, Pattmanagaram, Sromoolakarai Village, Srivaikundam Taluk, Thoothukudi District. | Mr.M. Rajagopal Survey No: 527/1A, Srivai-Vagaikulam Main Road, Pattmanagaram, Sromoolakarai Village, Srivaikundam Taluk, Thoothukudi District | Rs.4,000 | 22.03.2016 to 30.03.2016 |
44. | S. Selvam | Soil Investigation about construction of building for Mr.Johnson, S/O. A.Paramagnanam, 2-45, Valasamudram Street, Vembar South, Vilathikulam Taluk, Thoothukudi District | Mr.Johnson, S/O. A.Paramagnanam, 2-45, Valasamudram Street, Vembar South, Vilathikulam Taluk, Thoothukudi District | Rs.5,000 | 27.04.2016 to 30.04.2016 |
45. | S. Selvam | Hydro Geophysical investigation using Electrical Resistivity Method: a case study from Vadakkusillugan patti, Thoothukudi District. | Mr.Sambath, Vadakkusillugan patti, Thoothukudi District | Rs.6,000 | 01.09.2016 to 20.09.2016 |
46. | S. Selvam | Soil Investigation about construction of building for in koppampatti | Jila Cruzer and metrials Koppampatti | Rs.5,000 | 01.10.2016 to 10.10.2016 |
47. | A.Antony Ravindran | Granitic dyke investigation in Belari mines. | Geodynamic Consultant, Ganesh Nagar, Thoothukudi | Rs.7,000 | 01.05.2016 to 27.05.2016 |
48. | A.Antony ravindran | Geotechnical investigation study for Marriage hall construction survey N.220/2A1B Site using rotary Mechanical Drilling Rig. Method in Tiruchendur - Kaniyamumari S. H.176 | Aiswarya Associates, F. Md. Mujahith. M.Tech, State Bank Colony, Thoothukudi | Rs.5,000 | 23.05.2016 to 30.05.2013 |
49. | A.Antony Ravindran | Groundwater investigation study using Square array method in Samathanapuram | Mr. Murugan, Samathanapuram Tirunelveli | Rs.7,000 | 23.08.2016 to 30.08.2016 |
50. | A.Antony Ravindran | Groundwater investigation study using Square array method in Saweyarpuram | Author Jamesh, Saweyarpuram | Rs.6,000 | 21.10.2016 to 29.10.2016 |